Home > Non-metallic Ore Crusher > 700-800TPH limestone production line

700-800TPH limestone production line

After explosion, < 1020mm limestone will be conveyed into vibrating feeder by dumper, then the stone will be fed into jaw crusher for primary crushing, the discharged material is about 150-300mm; after primary crushing, the discharged material will be conveyed into impact crusher for secondary crushing; then the discharged material will be conveyed into vibrating screen, the required sizes will be screened out and the oversized material will return impact crusher for re-crushing until all the final products is the required sizes.

700-800TPH limestone production line

Note: 300mm material will be fed into impact crusher directly, no use of jaw crusher.

Configuration List

Equipment Model Quantity
Vibrating feeder ZSW1500×6000 1set
Jaw crusher PE-1200×1500 1set
Vibrating feeder ZSW1300×4900 2sets
Impact crusher PFS1318 4sets
Vibrating screen 4YZS2460 4sets

PrevPage: 200-250TPH Granite Stone Sand Making Production Line
Next Page: Limestone crushing line with capacity of 500-600 TPH

Hot Products:

Crawler Crusher Screw Sand Washing Machine Wheel Sand Washing Machines Vibrating Feeder
Vibrating Screen Screw Sand Washing Machine Wheel Sand Washing Machines Vibrating Feeder
Vibrating Screen Screw Sand Washing Machine Wheel Sand Washing Machines Vibrating Feeder