Will the mill operation should pay attention to what?

Date: 12/08/03      Author: kefidmobilecrusher.com

Q: Will the mill operation should pay attention to what?

A: The mill is 5-20mm, stone grinding to the desired fineness of the requirements of a process, which is a milling or grinding process. Shanghai Kefid Machinery Equipment Co., Ltd. to provide you with the scientific design and operating arrangements.

Before starting the mill, should be checked all the access door closed tight, adjust the fan and spindle steering, exhaust valve in the fully open position. Start the host feeding (should add a small pellet, coupled with normal particle size material) and then open the valve of the amount of wind, small exhaust valve should be shut out dusting the premise to ensure that the feed inlet. Then adjust the fineness of the finished product. With a series of jaw crusher and upgrade boot should check crusher jaw plate gap is in line with the feed grain size, and adjust the analysis of machine speed should be up to the approximate finished size requirements. Finally, in the following order to boot.

1, starting the bucket elevator
2, the start of jaw crusher
When the silo there are material to start to analyze the machine
4, start the blower (empty load start, to be normal operation after loading)
5, start the host, start the host instantly starts electromagnetic vibrating feeder. The milling work is begun. Simple operating sequence is as follows: "start" hoist --- Crusher --- analysis machine --- the fans --- Host --- feeder

Shutdown should be in the following order to close each machine:

1, close the feeder stops feeding
2, to one minute after the host
3, blower stop blowing net residual materials
4, the final closure of the analyzer
The stop order is: blower feeder --- Host --- --- analyzer
Note: transport material to the hopper of the elevator must last, first stop the crusher and then stop to enhance the feeding amount of this should be storage change
Oil mill in the normal working hours are not allowed to arbitrarily, to ensure production safety, milling machine in any part of the occurrence of abnormal noise, or the load suddenly increases should immediately stop the check, troubleshooting, and in order to avoid a major accident. Then continue the boot must be more than expected in the mill take out, whether just when the current is too large, affecting the start.

Shanghai Kefid Machinery Equipment Co., Ltd. has 20 years of mill research and development and production experience, independent research and development and production of high-performance Raymond, high pressure hanging roller mill, super pressure trapezium mill, the European version of the mill, vertical mill, micro mill, We sincerely welcome customers to visit, study.

Hot Products:

Crawler Crusher Screw Sand Washing Machine Wheel Sand Washing Machines Vibrating Feeder
Vibrating Screen Screw Sand Washing Machine Wheel Sand Washing Machines Vibrating Feeder